| Statement of Deficiencies | (X1) Provider/Supplier/CLIA Identification Number 01G011 | (X3) Date Survey Completed 10/08/2025 |
| Name of Provider or Supplier Rainbow Omega, Inc, | Street Address, City, State 202 Hope Drive, Eastaboga, AL | |
| For information on the provider's plan to correct this deficiency, please contact the provider or the state survey agency. | ||
| (X4) ID Prefix Tag | Summary Statement of Deficiencies
(Each deficiency should be preceded by full regulatory or LSC identifying information) |
| KS168 | Building Construction Type and Height CFR(s): NFPA 101 Building Construction Type and Height 2012 EXISTING (Slow) In Slow Evacuation Capability facilities, the facility shall be housed in a building where the interior is fully sheathed with lath and plaster or other material providing a 15-minute thermal barrier, including all portions of bearing walls, bearing partitions, floor construction, and roofs. All columns, beams, girders, and trusses shall be similarly encased or otherwise shall provide not less than a 1/2-hour fire resistance rating, unless modified by the modified by the following: * Exposed steel or wood columns, girders, and beams (but not joists) located in the basement shall be permitted. * Buildings of Type I, Type II (222), Type II (111), Type III (211), Type IV, Type V (111) construction shall not be required to meet the requirements of 33.2.1.3.2 (See 8.2.1). * Areas protected by approved automatic sprinkler systems in accordance with 33.2.3.5. shall not be required to meet the requirements of 33.2.1.3.2. * Unfinished, unused, and essentially inaccessible loft, attic, or crawl space shall not be required to meet the requirements of 33.2.1.3.2. * Where the facility achieves an E-score of 3 or less using the board and care occupancies evacuation capability determination methodology of NFPA 101A, Guide on Alternative Approaches to Life Safety. The requirements of 33.2.1.3.2 shall not apply. 33.2.1.3.2.1 through 33.2.1.3.2.7 This STANDARD is not met as evidenced by: Based on observation, the facility failed to maintain the interior sheathing that would provide at least a 15-minute thermal barrier per the requirements of: 2012 NFPA 101, 33.2.1.3.2.1 This deficiency affects 1 room. Findings include: During a tour of the facility, the surveyor observed in the Main Electrical Room, an unsealed penetration of multiple black, blue and white cables through an interior wall (the wall between the electrical room and Resident Toilet Room 110). A member of the maintenance staff was present when this deficiency was identified. |