Department of Health & Human Services

Centers for Medicare & Medicaid Services
Form Approved

OMB No. 0938-0391

Statement of Deficiencies (X1) Provider/Supplier/CLIA Identification Number 034526 (X3) Date Survey Completed 02/12/2020
Name of Provider or Supplier Paragon Physical Therapy And Rehab, Llc Street Address, City, State 2585 Miracle Mile, Suite 107, Bullhead City, AZ
For information on the provider's plan to correct this deficiency, please contact the provider or the state survey agency.
(X4) ID Prefix Tag Summary Statement of Deficiencies

(Each deficiency should be preceded by full regulatory or LSC identifying information)
E0000 42 CFR 485.51 Comprehensive Outpatient Rehabilitation Facilities (CORF).

The facility must meet all applicable Federal, State, and local emergency preparedness requirements as outlined in the Medicare and Medicaid Programs: Emergency Preparedness Requirements of Medicare and Medicaid Participating Providers and Suppliers Final Rule (81 FR 63860) September 16, 2016.

This is a Recertification Survey for Medicare, and was surveyed on February 12, 2020.

The following Condition level and Standard level deficiencies were found during the survey.
E0001 Establishment of the Emergency Program (EP)
CFR(s): 485.68

§403.748, §416.54, §418.113, §441.184, §460.84, §482.15, §483.73, §483.475, §484.102, §485.68, §485.542, §485.625, §485.727, §485.920, §486.360, §491.12 The [facility, except for Transplant Programs] must comply with all applicable Federal, State and local emergency preparedness requirements. The [facility, except for Transplant Programs] must establish and maintain a [comprehensive] emergency preparedness program that meets the requirements of this section.* The emergency preparedness program must include, but not be limited to, the following elements: * (Unless otherwise indicated, the general use of the terms "facility" or "facilities" in this Appendix refers to all provider and suppliers addressed in this appendix. This is a generic moniker used in lieu of the specific provider or supplier noted in the regulations. For varying requirements, the specific regulation for that provider/supplier will be noted as well.) *[For hospitals at §482.15:] The hospital must comply with all applicable Federal, State, and local emergency preparedness requirements. The hospital must develop and maintain a comprehensive emergency preparedness program that meets the requirements of this section, utilizing an all-hazards approach. The emergency preparedness program must include, but not be limited to, the following elements: *[For CAHs at §485.625:] The CAH must comply with all applicable Federal, State, and local emergency preparedness requirements. The CAH must develop and maintain a comprehensive emergency preparedness program, utilizing an all-hazards approach. The emergency preparedness program must include, but not be limited to, the following elements:


This CONDITION is not met as evidenced by:
Based on review of facility documents, and an interview with the facility administrator it was determined, the facility failed to

(E-0004) ensure that this CORF had developed, documented and implemented an Emergency Plan that was to be reviewed and updated at least annually. Failure to have an established Emergency plan poses the potential risk that the health and safety of patients and staff will be compromised in the event an Emergency situation occurs if staff are not knowledgeable of what to do during an emergency situation;

(E-0006) perform community and facility risk assessments as part of developing the facility's emergency plan;

(E-0007) ensure within an Emergency Preparedness plan that they incorporated documentation to include the needs of the patient population they serve or a delegation of authority as part of the continuity of operations. Failure to develop a continuity plan involving the patient population which includes delegation of authority and succession plans may cause disruption of services to patients/clients during an emergency which poses the potential risk of harm;

(E-0009) include a documented process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials. Failure to include a process for cooperation and collaboration poses the potential risk of harm to both patients and staff;

(E- 0013) develop Emergency Preparedness policies and procedures based on an established EP plan, community risk assessment and communication plan, and ensure policies and procedures were reviewed and updated at least annually;

(E-0020) have policies and procedures for safe evacuation from the facility including consideration of care needs of evacuees, staff responsibilities, transportation, identification of evacuation location(s), and primary and alternate means of communication with external sources of assistance. Failure to include a process for cooperation and collaboration poses a potential risk of harm to both patients and staff;

(E-0022) develop and implement a policy and procedure for sheltering in place during an emergency. Failure to adequately shelter in place during an emergency poses a potential risk of harm to both patients and staff;

(E-0024) develop and implement a policy and procedure for the use of volunteers in an emergency. Failure to address the use of volunteers in an emergency could adversely impact patient care during an emergency;

(E- 0029) develop a written emergency communications plan that demonstrates how the facility coordinates patient care within the facility, across the healthcare providers and with state and local public health departments, and emergency management systems. Failure to develop a written emergency communications plan poses the potential risk that all staff working in the facility will not be aware of their role expectations during any type of emergency that is encountered at the facility, which is a health and safety risk for their patients, as needed information may not be able to be transmitted or received;

(E-0032) have a primary and alternate means of communication during an emergency. Failure to have a primary and alternate means of communication during an emergency poses a potential risk of harm to both patients and staff;

(E-0034) develop a means of sharing information on occupancy, needs, and it's ability to provide assistance to the authority having jurisdiction. Failure to develop a means to report occupancy levels and/or needs may result in residents not receiving care and services as needed.

(E-0036) develop a facility based emergency planning, training and testing program. Failure to provide facility based training and testing tailored to the Emergency Plan may lead to untrained staff in an emergency situation and may result in the potential risk of harm to the patients during an emergency;

(E-0037) have documentation of new and existing staff trained in an Emergency Preparedness Plan. Failure to provide facility based training and testing tailored to the Emergency Plan may lead to untrained staff in an emergency situation and may result in the potential risk of harm to the patients during an emergency; and

(E-0039) conduct exercises to test an emergency plan at least annually. Failure to conduct exercises to test the emergency plan could lead to the potential risk of harm to both patients and staff.

The cumulative effect of these systematic deficient practices resulted in the facility's failure to meet the requirement for the Condition of Participation for Establishment of the Development of an Emergency Preparedness Plan, which poses a potential risk to the health and safety of patients and staff related to the potential risk of harm if staff and patients are not aware of what to do during an emergency situation.
E0004 Develop EP Plan, Review and Update Annually
CFR(s): 485.68(a)

§403.748(a), §416.54(a), §418.113(a), §441.184(a), §460.84(a), §482.15(a), §483.73(a), §483.475(a), §484.102(a), §485.68(a), §485.542(a), §485.625(a), §485.727(a), §485.920(a), §486.360(a), §491.12(a), §494.62(a). The [facility] must comply with all applicable Federal, State and local emergency preparedness requirements. The [facility] must develop establish and maintain a comprehensive emergency preparedness program that meets the requirements of this section. The emergency preparedness program must include, but not be limited to, the following elements: (a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be [reviewed], and updated at least every 2 years. The plan must do all of the following: * [For hospitals at §482.15 and CAHs at §485.625(a):] Emergency Plan. The [hospital or CAH] must comply with all applicable Federal, State, and local emergency preparedness requirements. The [hospital or CAH] must develop and maintain a comprehensive emergency preparedness program that meets the requirements of this section, utilizing an all-hazards approach. * [For LTC Facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually. * [For ESRD Facilities at §494.62(a):] Emergency Plan. The ESRD facility must develop and maintain an emergency preparedness plan that must be [evaluated], and updated at least every 2 years. .


This STANDARD is not met as evidenced by:
Based on review of facility documents, an interview with the facility administrator it was determined, the facility failed to ensure that this CORF had developed, documented and implemented an Emergency Plan that was reviewed and updated at least annually. Failure to have an established Emergency plan poses the potential risk that the health and safety of patients and staff will be compromised in the event an Emergency situation occurs if staff are not knowledgeable of what to do during an emergency situation.

Findings include:

Surveyor requested a copy of the facility Emergency Plan.

Administrator stated in an interview on 2/12/2020, that she was unaware of new EP regulations for a CORF.

The administrator confirmed during an exit conference on 2/12/2020, that the facility failed to develop an Emergency Preparedness Plan that is to be reviewed and updated annually.
E0006 Plan Based on All Hazards Risk Assessment
CFR(s): 485.68(a)(1)-(2)

§403.748(a)(1)-(2), §416.54(a)(1)-(2), §418.113(a)(1)-(2), §441.184(a)(1)-(2), §460.84(a)(1)-(2), §482.15(a)(1)-(2), §483.73(a)(1)-(2), §483.475(a)(1)-(2), §484.102(a)(1)-(2), §485.68(a)(1)-(2), §485.542(a)(1)-(2), §485.625(a)(1)-(2), §485.727(a)(1)-(2), §485.920(a)(1)-(2), §486.360(a)(1)-(2), §491.12(a)(1)-(2), §494.62(a)(1)-(2) [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years. The plan must do the following:] (1) Be based on and include a documented, facility-based and community-based risk assessment, utilizing an all-hazards approach.* (2) Include strategies for addressing emergency events identified by the risk assessment. * [For Hospices at §418.113(a):] Emergency Plan. The Hospice must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years. The plan must do the following: (1) Be based on and include a documented, facility-based and community-based risk assessment, utilizing an all-hazards approach. (2) Include strategies for addressing emergency events identified by the risk assessment, including the management of the consequences of power failures, natural disasters, and other emergencies that would affect the hospice's ability to provide care. *[For LTC facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually. The plan must do the following: (1) Be based on and include a documented, facility-based and community-based risk assessment, utilizing an all-hazards approach, including missing residents. (2) Include strategies for addressing emergency events identified by the risk assessment. *[For ICF/IIDs at §483.475(a):] Emergency Plan. The ICF/IID must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years. The plan must do the following: (1) Be based on and include a documented, facility-based and community-based risk assessment, utilizing an all-hazards approach, including missing clients. (2) Include strategies for addressing emergency events identified by the risk assessment.


This STANDARD is not met as evidenced by:
Based on facility record review, and interview, it was determined the facility failed to perform a community based risk assessments as part of developing the facility's emergency plan (EP). Failure to develop emergency plans based on a community-based risk assessment poses the potential risk of harm to the patients and staff during an emergency.

Findings include:

On 2/12/2020, them the EP tag requirements to be included in an EP plan were reviewed with the administrator. The facility did not have a documented EP, and it could not be determined if risk assessments for the community or the facility were completed.

The administrator stated in an interview on 2/12/2020 that she was unaware of new EP regulations for a CORF. It was determined that they did not have the facility's Emergency Preparedness Plan.

Failure to develop emergency plans based on community and facility risk assessments poses the potential risk of harm to the patients during an emergency if the facility has not made plans of how to handle emergencies that can affecct the well being of its patients..
E0007 EP Program Patient Population
CFR(s): 485.68(a)(3)

§403.748(a)(3), §416.54(a)(3), §418.113(a)(3), §441.184(a)(3), §460.84(a)(3), §482.15(a)(3), §483.73(a)(3), §483.475(a)(3), §484.102(a)(3), §485.68(a)(3), §485.542(a)(3), §485.625(a)(3), §485.727(a)(3), §485.920(a)(3), §491.12(a)(3), §494.62(a)(3). [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years. The plan must do the following:] (3) Address [patient/client] population, including, but not limited to, persons at-risk; the type of services the [facility] has the ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans.** *[For LTC facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually. The plan must do all of the following: (3) Address resident population, including, but not limited to, persons at-risk; the type of services the LTC facility has the ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans. *NOTE: ["Persons at risk" does not apply to: ASC, hospice, PACE, HHA, CORF, CMCH, RHC/FQHC, or ESRD facilities.]


This STANDARD is not met as evidenced by:
Based on record review and staff interview, it was determined the facility failed to ensure within an Emergency Preparedness plan that they incorporated documentation to include the needs of the patient population they serve or a delegation of authority as part of the continuity of operations. Failure to develop a continuity plan involving the patient population which includes delegation of authority and succession plans may cause disruption of services to patients/clients during an emergency, and poses a potential risk of harm to its patients.

Findings include:

On 2/12/2020 the EP tag requirements to be included in an EP plan were reviewed with the administrator. The facility did not have a documented EP, and the surveyor could not determine if a continuity plan involving the patient population which includes delegation of authority and succession plans were completed.

The administrator stated in an interview on 2/12/2020 that she was unaware of new EP regulations for a CORF. It was determined that they did not have the facility's Emergency Preparedness Plan.

The facility did not have documentation addressing the needs of the patient population or a delegation of authority within the current written plan.
E0009 Local, State, Tribal Collaboration Process
CFR(s): 485.68(a)(4)

§403.748(a)(4), §416.54(a)(4), §418.113(a)(4), §441.184(a)(4), §460.84(a)(4), §482.15(a)(4), §483.73(a)(4), §483.475(a)(4), §484.102(a)(4), §485.68(a)(4), §485.542(a)(4), §485.625(a)(4), §485.727(a)(5), §485.920(a)(4), §486.360(a)(4), §491.12(a)(4), §494.62(a)(4) [(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least every 2 years [annually for LTC facilities]. The plan must do the following:] (4) Include a process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials' efforts to maintain an integrated response during a disaster or emergency situation. * * [For ESRD facilities only at §494.62(a)(4)]: (4) Include a process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials' efforts to maintain an integrated response during a disaster or emergency situation. The dialysis facility must contact the local emergency preparedness agency at least annually to confirm that the agency is aware of the dialysis facility's needs in the event of an emergency.


This STANDARD is not met as evidenced by:
Based on record review and staff interview, it was determined, the facility failed to include a documented process for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials. Failure to include a process for cooperation and collaboration could pose a potential risk of harm to both patients and staff.

Findings include:

On 2/12/2020 the EP tag requirements to be included in an EP plan were reviewed with the provider. The facility did not have a documented EP, and it could not be determined if the facility had a process related to cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials as part of the requirements for an EP plan.

The administrator acknowledged on 2/12/2020, that the requirement include documentation for cooperation and collaboration with local, tribal, regional, State, and Federal emergency preparedness officials was not initiated to be part of their Emergency Plan.
E0013 Development of EP Policies and Procedures
CFR(s): 485.68(b)

§403.748(b), §416.54(b), §418.113(b), §441.184(b), §460.84(b), §482.15(b), §483.73(b), §483.475(b), §484.102(b), §485.68(b), §485.542(b), §485.625(b), §485.727(b), §485.920(b), §486.360(b), §491.12(b), §494.62(b). (b) Policies and procedures. [Facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years. *[For LTC facilities at §483.73(b):] Policies and procedures. The LTC facility must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least annually. *Additional Requirements for PACE and ESRD Facilities: *[For PACE at §460.84(b):] Policies and procedures. The PACE organization must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must address management of medical and nonmedical emergencies, including, but not limited to: Fire; equipment, power, or water failure; care-related emergencies; and natural disasters likely to threaten the health or safety of the participants, staff, or the public. The policies and procedures must be reviewed and updated at least every 2 years. *[For ESRD Facilities at §494.62(b):] Policies and procedures. The dialysis facility must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years. These emergencies include, but are not limited to, fire, equipment or power failures, care-related emergencies, water supply interruption, and natural disasters likely to occur in the facility's geographic area.


This STANDARD is not met as evidenced by:
Based on observation, interview and facility record review it was determined the facility failed to develop Emergency Preparedness policies and procedures based on an established EP plan, community risk assessment and communication plan, and failed to ensure the policies and procedures were reviewed and updated at least every 2 years.

Findings include:

On 2/12/2020 the EP tag requirements to be included in an EP plan were reviewed with the administrator. The facility did not have a documented EP, and the surveyors could not determine if policies and procedures were developed for the EP plan and reviewed.

The administrator stated in an interview on 2/12/2020 that she was unaware of new EP regulations for a CORF. It was determined that they did not have the facility's EP plan or that policies and procedures were developed for the EP plan.

Failure to develop policies and procedures based on an established EP plan may pose a potential risk of harm to the residents during an emergency.
E0020 Policies for Evac. and Primary/Alt. Comm.
CFR(s): 485.68(b)(1)

§403.748(b)(3), §416.54(b)(2), §418.113(b)(6)(ii), §441.184(b)(3), §460.84(b)(3), §482.15(b)(3), §483.73(b)(3), §483.475(b)(3), §485.68(b)(1), §485.542(b)(3), §485.625(b)(3), §485.727(b)(1), §485.920(b)(2), §491.12(b)(1), §494.62(b)(2) [(b) Policies and procedures. The [facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years [annually for LTC facilities]. At a minimum, the policies and procedures must address the following:] [(3) or (1), (2), (6)] Safe evacuation from the [facility], which includes consideration of care and treatment needs of evacuees; staff responsibilities; transportation; identification of evacuation location(s); and primary and alternate means of communication with external sources of assistance. *[For RNHCIs at §403.748(b)(3) and ASCs at §416.54(b)(2) and REHs at §485.542(b)(3):] Safe evacuation from the [RNHCI or ASC or REHs] which includes the following: (i) Consideration of care needs of evacuees. (ii) Staff responsibilities. (iii) Transportation. (iv) Identification of evacuation location(s). (v) Primary and alternate means of communication with external sources of assistance. * [For CORFs at §485.68(b)(1), Clinics, Rehabilitation Agencies, OPT/Speech at §485.727(b)(1), and ESRD Facilities at §494.62(b)(2):] Safe evacuation from the [CORF; Clinics, Rehabilitation Agencies, and Public Health Agencies as Providers of Outpatient Physical Therapy and Speech-Language Pathology Services; and ESRD Facilities], which includes staff responsibilities, and needs of the patients. * [For RHCs/FQHCs at §491.12(b)(1):] Safe evacuation from the RHC/FQHC, which includes appropriate placement of exit signs; staff responsibilities and needs of the patients.


This STANDARD is not met as evidenced by:
Based on record review and staff interview, it was determined, the facility failed to have policies and procedures for safe evacuation from the facility including consideration of care needs of evacuees, staff responsibilities, transportation, identification of evacuation location(s), and primary and alternate means of communication with external sources of assistance. Failure to include a process for cooperation and collaboration could pose a potential risk of harm to both patients and staff.

Findings include:

The State surveyor requested documentation that the facility had policies and procedures for safe evacuation from the facility including consideration of care needs of evacuees, staff responsibilities, transportation, identification of evacuation location(s), and primary and alternate means of communication with external sources of assistance as part of their EP plan on 2/12/2020. No policy related to the established EP plan was provided related to safe evacuation during an emergency situation.

The administrator confirmed in an interview on 2/12/2020 that they did not have policies and procedures for safe evacuation from the facility including consideration of care needs of evacuees, staff responsibilities, transportation, identification of evacuation location(s), and primary and alternate means of communication with external sources of assistance.
E0022 Policies/Procedures for Sheltering in Place
CFR(s): 485.68(b)(2)

§403.748(b)(4), §416.54(b)(3), §418.113(b)(6)(i), §441.184(b)(4), §460.84(b)(5), §482.15(b)(4), §483.73(b)(4), §483.475(b)(4), §485.68(b)(2), §485.542(b)(4), §485.625(b)(4), §485.727(b)(2), §485.920(b)(3), §491.12(b)(2), §494.62(b)(3). (b) Policies and procedures. The [facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years [annually for LTC facilities]. At a minimum, the policies and procedures must address the following:] [(4) or (2),(3),(5),(6)] A means to shelter in place for patients, staff, and volunteers who remain in the [facility]. *[For Inpatient Hospices at §418.113(b):] Policies and procedures. (6) The following are additional requirements for hospice-operated inpatient care facilities only. The policies and procedures must address the following: (i) A means to shelter in place for patients, hospice employees who remain in the hospice.


This STANDARD is not met as evidenced by:
Based on record review and staff interview, it was determined the facility failed to develop and implement a policy and procedure for sheltering in place during an emergency. Failure to adequately shelter in place during an emergency could pose a potential risk of harm to both patients and staff.

Findings include:

Surveyor requested a policy and procedure for sheltering in place during an emergency on 2/12/2020. The facility did not identify a process for sheltering patients and staff during an emergency based on an established EP plan.

The administrator acknowledged in an interview on 2/12/2020, the facility did not identify a process for sheltering patients and staff during an emergency.
E0024 Policies/Procedures-Volunteers and Staffing
CFR(s): 485.68(b)(4)

§403.748(b)(6), §416.54(b)(5), §418.113(b)(4), §441.184(b)(6), §460.84(b)(7), §482.15(b)(6), §483.73(b)(6), §483.475(b)(6), §484.102(b)(5), §485.68(b)(4), §485.542(b)(6), §485.625(b)(6), §485.727(b)(4), §485.920(b)(5), §491.12(b)(4), §494.62(b)(5). [(b) Policies and procedures. The [facilities] must develop and implement emergency preparedness policies and procedures, based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, and the communication plan at paragraph (c) of this section. The policies and procedures must be reviewed and updated at least every 2 years [annually for LTC facilities]. At a minimum, the policies and procedures must address the following:] (6) [or (4), (5), or (7) as noted above] The use of volunteers in an emergency or other emergency staffing strategies, including the process and role for integration of State and Federally designated health care professionals to address surge needs during an emergency. *[For RNHCIs at §403.748(b):] Policies and procedures. (6) The use of volunteers in an emergency and other emergency staffing strategies to address surge needs during an emergency. *[For Hospice at §418.113(b):] Policies and procedures. (4) The use of hospice employees in an emergency and other emergency staffing strategies, including the process and role for integration of State and Federally designated health care professionals to address surge needs during an emergency.


This STANDARD is not met as evidenced by:
Based on record review and staff interview, it was determined the facility failed to develop and implement a policy and procedure for the use of volunteers in an emergency. Failure to address the use of volunteers in an emergency could adversely impact patient care during an emergency.

Findings include:

On 2/12/2020, the facility's policies and procedures to address the use of volunteers in an emergency were requested. No policy was provided related to an established EP plan.

The administrator acknowledged during an interview on 2/12/2020, the facility did not have policies and procedures to address the use of volunteers in an emergency.
E0029 Development of Communication Plan
CFR(s): 485.68(c)

§403.748(c), §416.54(c), §418.113(c), §441.184(c), §460.84(c), §482.15(c), §483.73(c), §483.475(c), §484.102(c), §485.68(c), §485.542(c), §485.625(c), §485.727(c), §485.920(c), §486.360(c), §491.12(c), §494.62(c). (c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities].


This STANDARD is not met as evidenced by:
Based on review of facility documents, and interview, it was determined the facility failed to develop a written emergency communications plan that contained how the facility coordinates patient care within the facility, across the healthcare providers and with state and local public health departments, and emergency management systems. Failure to develop a written emergency communications plan poses the potential risk that all staff working in the facility will not be aware of their role expectations during any type of emergency that is encountered at the facility, which is a health and safety risk for their patients, as needed information may not be able to be transmitted or received.

Findings include:

On 2/12/2020, the facility's written emergency communications plan that contained how the facility coordinates patient care within the facility, across the healthcare providers and with state and local public health departments, and emergency management system was requested. No plan was provided related to an established EP plan.

The administrator acknowledged during an interview on 2/12/2020, the facility did not have a written emergency communications plan established for EP.
E0032 Primary/Alternate Means for Communication
CFR(s): 485.68(c)(3)

§403.748(c)(3), §416.54(c)(3), §418.113(c)(3), §441.184(c)(3), §460.84(c)(3), §482.15(c)(3), §483.73(c)(3), §483.475(c)(3), §484.102(c)(3), §485.68(c)(3), §485.542(c)(3), §485.625(c)(3), §485.727(c)(3), §485.920(c)(3), §486.360(c)(3), §491.12(c)(3), §494.62(c)(3). [(c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. The communication plan must include all of the following: (3) Primary and alternate means for communicating with the following: (i) [Facility] staff. (ii) Federal, State, tribal, regional, and local emergency management agencies. *[For ICF/IIDs at §483.475(c):] (3) Primary and alternate means for communicating with the ICF/IID's staff, Federal, State, tribal, regional, and local emergency management agencies.


This STANDARD is not met as evidenced by:
Based on record review, and staff interview, it was determined the facility failed to have a primary and alternate means of communication during an emergency. Failure to have a primary and alternate means of communication during an emergency could pose a potential risk of harm to both patients and staff.

Findings include:

Documentation to demonstrate how the facility identified a primary and alternate means of communicating between staff and Federal, State, tribal, regional, and local emergency management agencies during an emergency was requested.

No documentation of theses required items in the Emergency Plan were provided.

The administrator acknowledged in an interview on 2/12/2020, the facility did not identify a primary and alternate means of communicating between staff and/or Federal, State, tribal, regional, and local emergency management agencies during an emergency.
E0034 Information on Occupancy/Needs
CFR(s): 485.68(c)(5)

§403.748(c)(7), §416.54(c)(7), §418.113(c)(7) §441.184(c)(7), §482.15(c)(7), §460.84(c)(7), §483.73(c)(7), §483.475(c)(7), §484.102(c)(6), §485.68(c)(5), §485.68(c)(5), §485.727(c)(5), §485.542(c)(7), §485.625(c)(7), §485.920(c)(7), §491.12(c)(5), §494.62(c)(7). [(c) The [facility] must develop and maintain an emergency preparedness communication plan that complies with Federal, State and local laws and must be reviewed and updated at least every 2 years [annually for LTC facilities]. The communication plan must include all of the following: (7) [(5) or (6)] A means of providing information about the [facility's] occupancy, needs, and its ability to provide assistance, to the authority having jurisdiction, the Incident Command Center, or designee. *[For ASCs at 416.54(c)]: (7) A means of providing information about the ASC's needs, and its ability to provide assistance, to the authority having jurisdiction, the Incident Command Center, or designee. *[For Inpatient Hospice at §418.113(c):] (7) A means of providing information about the hospice's inpatient occupancy, needs, and its ability to provide assistance, to the authority having jurisdiction, the Incident Command Center, or designee.


This STANDARD is not met as evidenced by:
Based on record review, and staff interview, it was determined the facility failed to develop a means to sharing information on occupancy, needs, and it's ability to provide assistance to the authority having jurisdiction. Failure to develop a means to report occupancy levels and/or needs may result in residents not receiving care and services as needed.

Findings include:

Documentation that included a method to share occupancy levels and/or facility needs to other facilities or to the authority having jurisdiction or the Incident Command Center, during an emergency situation was requested on 2/12/20. No documentation was provided.

The administrator acknowledged in an interview on 2/12/2020, the facility did not have available documentation related to a method to share occupancy levels and/or facility needs to other facilities or to the authority having jurisdiction or the Incident Command Center if an emergency situation warranted this requirement.
E0036 EP Training and Testing
CFR(s): 485.68(d)

§403.748(d), §416.54(d), §418.113(d), §441.184(d), §460.84(d), §482.15(d), §483.73(d), §483.475(d), §484.102(d), §485.68(d), §485.542(d), §485.625(d), §485.727(d), §485.920(d), §486.360(d), §491.12(d), §494.62(d). *[For RNCHIs at §403.748, ASCs at §416.54, Hospice at §418.113, PRTFs at §441.184, PACE at §460.84, Hospitals at §482.15, HHAs at §484.102, CORFs at §485.68, REHs at §485.542, CAHs at §486.625, "Organizations" under 485.727, CMHCs at §485.920, OPOs at §486.360, and RHC/FHQs at §491.12:] (d) Training and testing. The [facility] must develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The training and testing program must be reviewed and updated at least every 2 years. *[For LTC facilities at §483.73(d):] (d) Training and testing. The LTC facility must develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The training and testing program must be reviewed and updated at least annually. *[For ICF/IIDs at §483.475(d):] Training and testing. The ICF/IID must develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The training and testing program must be reviewed and updated at least every 2 years. The ICF/IID must meet the requirements for evacuation drills and training at §483.470(i). *[For ESRD Facilities at §494.62(d):] Training, testing, and orientation. The dialysis facility must develop and maintain an emergency preparedness training, testing and patient orientation program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The training, testing and orientation program must be evaluated and updated at every 2 years.


This STANDARD is not met as evidenced by:
Based on record review and staff interview, it was determined the facility failed to develop a facility based emergency planning, training and testing program. Failure to provide facility based training and testing tailored to the Emergency Plan may lead to untrained staff in an emergency situation, and may pose the potential risk of in harm to the patients during an emergency, if staff are not properly trained on what to do.

Finding include:

Documentation of a facility based training and testing program for staff based on the facility Emergency Plan, facility risk assessment and the communications plan was requested. No facility based training and testing program/documentation was provided.

The administrator confirmed during an interview on 2/12/2020, they did not have an Emergency Plan to include facility based training and testing for staff based on the Emergency Plan, facility risk assessment and the communications plan.
E0037 EP Training Program
CFR(s): 485.68(d)(1)

§403.748(d)(1), §416.54(d)(1), §418.113(d)(1), §441.184(d)(1), §460.84(d)(1), §482.15(d)(1), §483.73(d)(1), §483.475(d)(1), §484.102(d)(1), §485.68(d)(1), §485.542(d)(1), §485.625(d)(1), §485.727(d)(1), §485.920(d)(1), §486.360(d)(1), §491.12(d)(1). *[For RNCHIs at §403.748, ASCs at §416.54, Hospitals at §482.15, ICF/IIDs at §483.475, HHAs at §484.102, REHs at §485.542, "Organizations" under §485.727, OPOs at §486.360, RHC/FQHCs at §491.12:] (1) Training program. The [facility] must do all of the following: (i) Initial training in emergency preparedness policies and procedures to all new and existing staff, individuals providing services under arrangement, and volunteers, consistent with their expected roles. (ii) Provide emergency preparedness training at least every 2 years. (iii) Maintain documentation of all emergency preparedness training. (iv) Demonstrate staff knowledge of emergency procedures. (v) If the emergency preparedness policies and procedures are significantly updated, the [facility] must conduct training on the updated policies and procedures. *[For Hospices at §418.113(d):] (1) Training. The hospice must do all of the following: (i) Initial training in emergency preparedness policies and procedures to all new and existing hospice employees, and individuals providing services under arrangement, consistent with their expected roles. (ii) Demonstrate staff knowledge of emergency procedures. (iii) Provide emergency preparedness training at least every 2 years. (iv) Periodically review and rehearse its emergency preparedness plan with hospice employees (including nonemployee staff), with special emphasis placed on carrying out the procedures necessary to protect patients and others. (v) Maintain documentation of all emergency preparedness training. (vi) If the emergency preparedness policies and procedures are significantly updated, the hospice must conduct training on the updated policies and procedures. *[For PRTFs at §441.184(d):] (1) Training program. The PRTF must do all of the following: (i) Initial training in emergency preparedness policies and procedures to all new and existing staff, individuals providing services under arrangement, and volunteers, consistent with their expected roles. (ii) After initial training, provide emergency preparedness training every 2 years. (iii) Demonstrate staff knowledge of emergency procedures. (iv) Maintain documentation of all emergency preparedness training. (v) If the emergency preparedness policies and procedures are significantly updated, the PRTF must conduct training on the updated policies and procedures. *[For PACE at §460.84(d):] (1) The PACE organization must do all of the following: (i) Initial training in emergency preparedness policies and procedures to all new and existing staff, individuals providing on-site services under arrangement, contractors, participants, and volunteers, consistent with their expected roles. (ii) Provide emergency preparedness training at least every 2 years. (iii) Demonstrate staff knowledge of emergency procedures, including informing participants of what to do, where to go, and whom to contact in case of an emergency. (iv) Maintain documentation of all training. (v) If the emergency preparedness policies and procedures are significantly updated, the PACE must conduct training on the updated policies and procedures. *[For LTC Facilities at §483.73(d):] (1) Training Program. The LTC facility must do all of the following: (i) Initial training in emergency preparedness policies and procedures to all new and existing staff, individuals providing services under arrangement, and volunteers, consistent with their expected role. (ii) Provide emergency preparedness training at least annually. (iii) Maintain documentation of all emergency preparedness training. (iv) Demonstrate staff knowledge of emergency procedures. *[For CORFs at §485.68(d):](1) Training. The CORF must do all of the following: (i) Provide initial training in emergency preparedness policies and procedures to all new and existing staff, individuals providing services under arrangement, and volunteers, consistent with their expected roles. (ii) Provide emergency preparedness training at least every 2 years. (iii) Maintain documentation of the training. (iv) Demonstrate staff knowledge of emergency procedures. All new personnel must be oriented and assigned specific responsibilities regarding the CORF's emergency plan within 2 weeks of their first workday. The training program must include instruction in the location and use of alarm systems and signals and firefighting equipment. (v) If the emergency preparedness policies and procedures are significantly updated, the CORF must conduct training on the updated policies and procedures. *[For CAHs at §485.625(d):] (1) Training program. The CAH must do all of the following: (i) Initial training in emergency preparedness policies and procedures, including prompt reporting and extinguishing of fires, protection, and where necessary, evacuation of patients, personnel, and guests, fire prevention, and cooperation with firefighting and disaster authorities, to all new and existing staff, individuals providing services under arrangement, and volunteers, consistent with their expected roles. (ii) Provide emergency preparedness training at least every 2 years. (iii) Maintain documentation of the training. (iv) Demonstrate staff knowledge of emergency procedures. (v) If the emergency preparedness policies and procedures are significantly updated, the CAH must conduct training on the updated policies and procedures. *[For CMHCs at §485.920(d):] (1) Training. The CMHC must provide initial training in emergency preparedness policies and procedures to all new and existing staff, individuals providing services under arrangement, and volunteers, consistent with their expected roles, and maintain documentation of the training. The CMHC must demonstrate staff knowledge of emergency procedures. Thereafter, the CMHC must provide emergency preparedness training at least every 2 years.


This STANDARD is not met as evidenced by:
Based on record review of the facility Emergency Preparedness Plan, and staff interview, it was determined the facility failed to have documentation of new and existing staff trained in an Emergency Preparedness Plan. Failure to provide facility based training and testing tailored to the Emergency Plan may lead to untrained staff in an emergency situation and may result in harm to the patients during an emergency.

Finding include:

Documentation to demonstrate the facility's Emergency Plan including annual facility based training and testing for staff based on an established Emergency Plan was requested. No documentation related to annual facility based training and testing for staff based on an established Emergency Plan was provided.

The administrator confirmed during an interview on 2/12/2020, the facility did not have an EP plan to include annual facility based training and testing for staff based on an Emergency Plan.
E0039 EP Testing Requirements
CFR(s): 485.68(d)(2)

§416.54(d)(2), §418.113(d)(2), §441.184(d)(2), §460.84(d)(2), §482.15(d)(2), §483.73(d)(2), §483.475(d)(2), §484.102(d)(2), §485.68(d)(2), §485.542(d)(2), §485.625(d)(2), §485.727(d)(2), §485.920(d)(2), §491.12(d)(2), §494.62(d)(2). *[For ASCs at §416.54, CORFs at §485.68, REHs at §485.542, OPO, "Organizations" under §485.727, CMHCs at §485.920, RHCs/FQHCs at §491.12, and ESRD Facilities at §494.62]: (2) Testing. The [facility] must conduct exercises to test the emergency plan annually. The [facility] must do all of the following: (i) Participate in a full-scale exercise that is community-based every 2 years; or (A) When a community-based exercise is not accessible, conduct a facility-based functional exercise every 2 years; or (B) If the [facility] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required community-based or individual, facility-based functional exercise following the onset of the actual event. (ii) Conduct an additional exercise at least every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [facility's] emergency plan, as needed. *[For Hospices at 418.113(d):] (2) Testing for hospices that provide care in the patient's home. The hospice must conduct exercises to test the emergency plan at least annually. The hospice must do the following: (i) Participate in a full-scale exercise that is community based every 2 years; or (A) When a community based exercise is not accessible, conduct an individual facility based functional exercise every 2 years; or (B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in its next required full scale community-based exercise or individual facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (3) Testing for hospices that provide inpatient care directly. The hospice must conduct exercises to test the emergency plan twice per year. The hospice must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual facility-based functional exercise; or (B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospice is exempt from engaging in its next required full-scale community based or facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop led by a facilitator that includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the hospice's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the hospice's emergency plan, as needed. *[For PRFTs at §441.184(d), Hospitals at §482.15(d), CAHs at §485.625(d):] (2) Testing. The [PRTF, Hospital, CAH] must conduct exercises to test the emergency plan twice per year. The [PRTF, Hospital, CAH] must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the [PRTF, Hospital, CAH] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an [additional] annual exercise or and that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, a facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the [facility's] emergency plan, as needed. *[For PACE at §460.84(d):] (2) Testing. The PACE organization must conduct exercises to test the emergency plan at least annually. The PACE organization must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or (B) If the PACE experiences an actual natural or man-made emergency that requires activation of the emergency plan, the PACE is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or individual, a facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the PACE's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the PACE's emergency plan, as needed. *[For LTC Facilities at §483.73(d):] (2) The [LTC facility] must conduct exercises to test the emergency plan at least twice per year, including unannounced staff drills using the emergency procedures. The [LTC facility, ICF/IID] must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise. (B) If the [LTC facility] facility experiences an actual natural or man-made emergency that requires activation of the emergency plan, the LTC facility is exempt from engaging its next required a full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the [LTC facility] facility's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [LTC facility] facility's emergency plan, as needed. *[For ICF/IIDs at §483.475(d)]: (2) Testing. The ICF/IID must conduct exercises to test the emergency plan at least twice per year. The ICF/IID must do the following: (i) Participate in an annual full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or. (B) If the ICF/IID experiences an actual natural or man-made emergency that requires activation of the emergency plan, the ICF/IID is exempt from engaging in its next required full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event. (ii) Conduct an additional annual exercise that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the ICF/IID's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the ICF/IID's emergency plan, as needed. *[For HHAs at §484.102] (d)(2) Testing. The HHA must conduct exercises to test the emergency plan at least annually. The HHA must do the following: (i) Participate in a full-scale exercise that is community-based; or (A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise every 2 years; or. (B) If the HHA experiences an actual natural or man-made emergency that requires activation of the emergency plan, the HHA is exempt from engaging in its next required full-scale community-based or individual, facility based functional exercise following the onset of the emergency event. (ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following: (A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or (B) A mock disaster drill; or (C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (iii) Analyze the HHA's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the HHA's emergency plan, as needed. *[For OPOs at §486.360] (d)(2) Testing. The OPO must conduct exercises to test the emergency plan. The OPO must do the following: (i) Conduct a paper-based, tabletop exercise or workshop at least annually. A tabletop exercise is led by a facilitator and includes a group discussion, using a narrated, clinically relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. If the OPO experiences an actual natural or man-made emergency that requires activation of the emergency plan, the OPO is exempt from engaging in its next required testing exercise following the onset of the emergency event. (ii) Analyze the OPO's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the [RNHCI's and OPO's] emergency plan, as needed. *[ RNCHIs at §403.748]: (d)(2) Testing. The RNHCI must conduct exercises to test the emergency plan. The RNHCI must do the following: (i) Conduct a paper-based, tabletop exercise at least annually. A tabletop exercise is a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. (ii) Analyze the RNHCI's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the RNHCI's emergency plan, as needed.


This STANDARD is not met as evidenced by:
Based on record review and staff interview, it was determined the facility failed to conduct exercises to test an emergency plan at least annually. Failure to conduct exercises to test the emergency plan could pose a potentail risk of harm to both patients and staff.

Findings include:

The facility's Emergency Preparedness Testing Requirements were requested. The facility was unable to provide documentation for Emergency Preparedness Testing Requirements to include the following:

1. Participate in a full-scale exercise (FSE) that is community-based.

2. Conduct an additional exercise that may include, but is not limited to the following: (A) A second FSE that is individual, facility-based. (B) A tabletop exercise.

The administator confirmed during the exit conference on 2/12/2020, the facility did not participate in the required Emergency Preparedness Testing Requirements to participate in a full-scale exercise that is community-based and the additional required exercise.
I0000 No deficiencies were found during the Medicare Recertification survey for the I tags conducted on February 12, 2020 for a Comprehensive Outpatient Rehabilitation Facility.