| Statement of Deficiencies | (X1) Provider/Supplier/CLIA Identification Number 55C0001076 | (X3) Date Survey Completed 07/10/2019 |
| Name of Provider or Supplier Plastic Surg Assoc Of Orange County | Street Address, City, State 1310 Stewart Drive, Suite 610, Orange, CA | |
| For information on the provider's plan to correct this deficiency, please contact the provider or the state survey agency. | ||
| (X4) ID Prefix Tag | Summary Statement of Deficiencies
(Each deficiency should be preceded by full regulatory or LSC identifying information) |
| K0914 | Electrical Systems - Maintenance and Testing CFR(s): NFPA 101 Electrical Systems - Maintenance and Testing Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For, LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results. 6.3.4 (NFPA 99) This STANDARD is not met as evidenced by: Based on record review, facility failed to maintain electrical receptacles. This was evidenced by failing to provide complete documents of inspection and testing of electrical receptacles, and have a maintenance program for their hospital grade receptacles. This affected two of two smoke compartments. This could potentially cause a fire and potential harm to patients and staff, in the event of a fire. National Fire Prevention Association 99, Healthcare Facilities Code, 2012 Edition 6.3.4.1.1 Where hospital-grade receptacles are required at patient bed locations and in locations where deep sedation or general anesthesia is administered, testing shall be performed after initial installation, replacement, or servicing of the device. 6.3.4.1.3 Receptacles not listed as hospital-grade, at patient bed locations and in locations where deep sedation or general anesthesia is administered, shall be tested at intervals not exceeding 12 months. 6.3.4.2.1.1 A record shall be maintained of the tests required by this chapter and associated repairs or modification. 6.3.4.2.1.2 At a minimum, the record shall contain the date, the rooms or areas tested, and an indication of which items have met, or have failed to meet, the performance requirements of this chapter. Findings: During tour of the facility with the Medical Assistance on 7/10/19, the electrical receptacle maintenance record was reviewed. At 11:42 a.m., facility failed to provide complete documentation to show maintenance of receptacles testing and inspection. There was no information on the physical integrity of the receptacles, continuity of the grounding circuit verified, correction polarity of the hot and neutral connection and the retention force. At 11:43 a.m., during an interview with the Nursing Director, she stated that she believed the vendor was conducting the maintenance, inspections, and testing of the receptacles. |